The vessel was built in 1996 on the base of the landing stage, Project 55, the length of the reinforced concrete hull is 45 m, the design of the 60s was left. The vessel was under operation in Kazan more than 10 years. At present the vessel is under operation in Moscow Region. Provided in the vessel are seven two-bed rooms, two "A"class rooms, a sauna, a cafe, a room for carrying out the meetings.

uboc005 uboc006

uboc001 uboc002

 uboc003 uboc004

DEBUG CONTROL 
     version: CMS Brane 1.3.9 (utf8)
   client ip: 18.226.169.94
time control: started
time control: lo: 0,17105	 [2.87 Mb],	summ: 0,17105	 [9.82 Mb]