The floating hotel was built on the base of the landing stage, Project  No.33/775, 65 meters long, the outer design was left untouched.

The restaurant for 200 persons is provided for on the main deck. A hotel for 50 persons is located on the deck of the superstructure.

The floating hotel is sited in the historical part of Yaroslavl town in the complex, including a stationary platform from the river part and additional hotel building, installed on piles. The foundation on piles serves as ice protection device of the whole complex.

The complex was put into operation in 2005.

0012

0022 0042 0032

DEBUG CONTROL 
     version: CMS Brane 1.3.9 (utf8)
   client ip: 3.15.190.144
time control: started
time control: lo: 0,1448	 [2.87 Mb],	summ: 0,1448	 [9.82 Mb]