The quay is designed for mooring of vessels, for passage of the heavy transport by the quay, for carrying out of cargo handling works, for supply of different types of electric power, of gas and fuel from the shore to a vessel.

The quay can consist from several similar metal pontoons (standard set of the quay is three pontoons, providing for the mooring of ships with displacement up to 18000 t), steel shore-to-quay connection bridge and engineering lines.

 

Length of the quay from three pontoons (without the bridge), m about 153
Bridge length, m 23,7
Length of one pontoon, m 50
Breadth of the quay, m 14
Height of the side, m 2,7

 

10 quays of different types have been built according to the present project.

 

QUAY FOR VIETNAM

0031 0041 0051

0011 0021

 

QUAY WITH ENERGY POWER PONTOON

Main purpose of the quay is mooring of atomic power submarines and supply of power from the pontoon to a submarine.

0061 007

DEBUG CONTROL 
     version: CMS Brane 1.3.9 (utf8)
   client ip: 3.149.234.141
time control: started
time control: lo: 0,17183	 [2.88 Mb],	summ: 0,17183	 [9.82 Mb]