Transfer docks are designed for launching and lifting of vessels from/to the slipways, for transporting of vessels from the bank wall to the dock site and for standard docking with the withdrawn dock trestle.


Transfer docks, built according to our projects, are successfully operated at the shipyard "Almaz" in St. Petersburg (the lifting capacity of the dock is 1000/3000 tons) and at Bach Dang yard in Hai Phong town, Vietnam (the lifting capacity of the dock is 3500/4200 tons).

 

Lifting capacity (during launching/repair), t 3500/4200 2500/3000 1000/3000
Length over pontoon deck, m 100,0 83,2 83,2
Breadth overall, m 32,1 31,0 40,5
Breadth of pontoon deck, m 23,3 23,3 31,7
Ultimate water level above the pontoon deck, m 8,7/8,9 8,35/8,7 9,25/9,45

 