OUTFITTING OF THE REPAIR DOCK TO THE TRANSFER DOCK

Outfitting of the metal repair dock, Project 1778, to the transfer dock at JSC "Vostok Shipyard".

The floating repair dock, Project 1778, was outfitted in 2006 at JSC "Vostok Shipyard" according to the project ofCDB "Monolit". The shipyard is now able to broaden its possibilities and to launch the perspective vessels for the Navy with displacement up to 2000 t from the slipways.

Floating metal wharves of different modifications, designed by CDB "Monolit" for FSB and МО of the RF, are launched nowadays by means of the present dock.

0011 0021 0031

DEBUG CONTROL 
     version: CMS Brane 1.3.9 (utf8)
   client ip: 3.144.86.38
time control: started
time control: lo: 0,17345	 [2.87 Mb],	summ: 0,17345	 [9.82 Mb]