Construction of the hotel started in 2007 on the base of the floating workshop, Project 889А, the length of the reinforced hull is 62 m. The vessel was delivered to the Customer ready for carrying out the finishing works.

Outfitting of the vessel was carried out at its installation site. The hotel was put into operation on January 2, 2009 on the Moscow River in the historical part of Kolomna town, not far from the Kremlin of Kolomna and the Skating Sport Centre.

There are 57 rooms in the hotel - 8 rooms of "A"class, 2 studios and 47 standard rooms. The hotel's restaurant with an exclusive design is for 200 persons.  The floors in it are made from black marine oak-tree, on which you can see with the pictures of the local ancient architecture. Provided in the vessel is a sauna with a swimming pool.

kolomna001 kolomna003

kolomna004 kolomna005

kolomna0021

DEBUG CONTROL 
     version: CMS Brane 1.3.9 (utf8)
   client ip: 3.144.6.29
time control: started
time control: lo: 0,14532	 [2.87 Mb],	summ: 0,14532	 [9.83 Mb]