The complex consists from two ships: floating yacht-club, Project 33/876А, and connected with it floating swimming pool, Project 831/808. The complex was put into operation in 2006.
Floating yacht club was built on the base of the landing stage with 65 meters long reinforced concrete hull. Provided on board the ship is the restaurant for 200 persons, complex of rooms for the guests of the yacht club's captain, service rooms. The operation of the complex is seasonal. Provided is the possibility of winter storage of the vessel when the temperature aboard is above zero.
The floating swimming pool was reconstructed from a 35 meters long reinforced concrete landing stage . The size of the swimming pool is 24 х 8 х 1,8 m. The pool is metal, covered by polymer materials. Equipment for water treatment and heating is provided for in the compartments of the hold.

002 001

007 003

005

DEBUG CONTROL 
     version: CMS Brane 1.3.9 (utf8)
   client ip: 3.81.79.135
time control: started
time control: lo: 0,15868	 [2.87 Mb],	summ: 0,15868	 [9.82 Mb]